Replace wooden front doors with Aluminium doors on 4 classrooms
Replace rear doors on 4 classrooms with double opening doors
Replace windows in one classroom with aluminium frames
Upgrade lighting in one classroom to LED lighting
Remove redundant heating pipes and celling fans and make good walls and ceilings
Supply and install cover over the courtyard
Supply and install a second cover to create an outside breakout space
Numat REC rubber matting to the area under the canopy with a design pattern allowed
Repair and replace the hard court area between Block 2 and the Hall
Create an outdoor garden teaching area for healthy eating
Project date: July 2022-September 2022
Total Project Value: $190,000