The scope of this project includes:
Replace the internal wall linings.
Blocks A, B, C, and D (known to the school as A Block) as they have reached end-of-life, requiring replacement.
The rooms that are included in the scope are:
- Downstairs – A15, A16, A17, A18, A19, TPT Room
- Upstairs – A1, A2, A3, A4, A5, A6, A7, A9, A10, A11, A12, A13, A14.
Project start date: September 2023