The scope of this project includes:

Replace the internal wall linings.

Blocks A, B, C, and D (known to the school as A Block) as they have reached end-of-life, requiring replacement. 

The rooms that are included in the scope are:

  • Downstairs – A15, A16, A17, A18, A19, TPT Room
  • Upstairs – A1, A2, A3, A4, A5, A6, A7, A9, A10, A11, A12, A13, A14.

Project start date: September 2023

Before photos:

 


The steel has been erected