Block 3 ILE Upgrade

Block 3 currently comprises of 4 classrooms, and the girls/boys toilet blocks.

Project Scope:

Classrooms

  • Remove and dispose of carpet, supply and install of new 16oz direct carpet stick carpet tiles.
  • Remove and dispose of the existing hessian wallcoverings. Supply and install new 10mm composite acoustic wall coverings.
  • Existing exposed cables to be concealed behind the wall linings.
  • Remove and dispose of the existing vinyl and replace with new.
  • Supply and install lockable white board cabinets.
  • Supply and install 2x interior sliding doors on adjoining walls between rooms 4 and 5 and rooms 2 and 3.
  • Replace joinery with aluminium joinery and rebuild the existing brick windowsills as per the construction drawings.

Toilets

  • Remove, dispose of the existing wall partitions and supply and replace with new.
  • Remove, dispose of the existing pans and cisterns and replace with new.
  • Remove, dispose of the existing vinyl and replace with new.
  • Remove, dispose of the existing basins and replace with new.
  • Replace joinery with aluminium joinery and rebuild the existing brick windowsills as per the construction drawings.
  • Remove and replace the existing hot water and electrical supply.

Cloak Bay

  • Remove and replace the existing vinyl as per the construction drawings
  • Convert existing cloak bays to break out spaces.

Exterior

  • Replace cladding as required around window joinery.