In support of our Registration of Interest, we submit below details of recent projects and relevant projects completed in the past 10 years.

 

Please enjoy looking through some of our latest projects by simply clicking on the images.

Waimahia Intermediate School

The Requirement: The Technology Hub refurbishment project involves the refurbishing of three existing technology classrooms: the Hard technology, Visual Arts and Performance  classrooms. The project will involve the installation of new sliding doors between the Hard technology and Visual Arts areas. The removal of a Wall in the Performance classroom and the installation of a…

Details

Papakura Normal School

The Contract Works required are: • Demolition • Asbestos refurbishment survey • Replacement of partition doors and walls • Replacement of toilets • Replacement of basins and taps • Installation of bench seating • Replacement of floor coverings • Replacement of wall coverings • Installation of hot water cylinders (including cabinetry) • Installation of coat…

Details

Ferguson Intermediate School

Block 9 ILE Upgrade at Ferguson Intermediate School Classrooms to be internally refurbish in Block 9 including autex installation, flooring, ceiling and lighting and removal of a wall. Project Start Date: August 2024 Site Foreman: James Howdill

Details

Mangere College

Block G (Gym) Refurbishment at Mangere College The Contract Works required are: • Asbestos refurbishment survey • Flooring • Wall lining • Ventilation • Carpentry • Plumbing • Electrical • Roofing. Project Start Date: June 2024 Site Foreman: Loto Faamoana

Details

Macleans Primary School

Project Details: Demolition of existing walls, roof, wall coverings, floor coverings, ceilings linings, windows, doors , fixtures, furniture, electrical, and lighting Construct new wall framing and floor framing including foundations and waterproofing Supply and installation of new exterior cladding Supply and installation of new lintels Supply and installation of new ceiling framing Supply and installation…

Details

Sunnynook Primary School

The Requirement The Contract Works required are: Block 9: Rooms 21 & 22. Interior refurbishment and outdoor learning area. Scope or works to include: • replace existing wall linings, • install acoustic ceiling tiles to Room 22, • install new large sliding doors to Rooms 21 &22 • Create a new covered outdoor learning area…

Details

Owairoa Primary School

Block 3 ILE Upgrade Block 3 currently comprises of 4 classrooms, and the girls/boys toilet blocks. Project Scope: Classrooms Remove and dispose of carpet, supply and install of new 16oz direct carpet stick carpet tiles. Remove and dispose of the existing hessian wallcoverings. Supply and install new 10mm composite acoustic wall coverings. Existing exposed cables…

Details

Macleans Primary School

Project Scope – Block 5 Hall Extension & Deck. Demolition of existing walls, claddings, gutters, downpipes, wall linings, doors, stairs, balustrades. Supply and construction of new deck including foundations. Supply and construction of new wall framing and floor framing including foundations and waterproofing. Supply and installation of new structural steel. Supply and installation of new exterior…

Details

Kauri Park School

Project Scope: Block 8 (Rooms 9 & 10) o Remove x2 sets of exterior windows to each classroom. o Install 3 door stackers. o Remedial work to include existing wall linings and wall trims. o Replace existing wall linings with new acoustic wall linings in both classrooms. o In Room 10, replace existing ceiling baffles…

Details