The Requirement:
Background
The Board of Trustees at Mahurangi College wish to engage a main contractor for the Refurbishment of the Gymnasium. The goal is to improve the overall condition of the space, functionality and the passive surveillance.
The works included were the following:
- Refurbishment of the existing Gymnasium changing room, toilet facilities and mezzanine alteration
- New vinyl or carpet floor coverings as appropriate
- New LED lighting
- Fire Doors installation
- Ventilation installation
- Roof Replacement
- Project Consultants
Required solution
(method and approach)
The works included were the following:
Refurbishment of the existing Gymnasium changing room, toilet facilities and mezzanine alteration which should include: – new floor coverings – replacement of any vandalized/damaged wall linings – new shower fittings & associated plumbing – new toilet pans and urinals – new toilet partitions – new sinks and taps
The Contract Works required are:
- Refurbishment of the existing Gymnasium changing room, toilet facilities and mezzanine alteration which should include: – new floor coverings – replacement of any vandalized/damaged wall linings – new shower fittings & associated plumbing – new toilet pans and urinals – new toilet partitions – new sinks and taps
- New vinyl or carpet floor coverings as appropriate in the following areas: – entrance foyer – ground level corridor(s) – upstairs offices & landing – HDU bathroom.
- New LED lighting in the following areas: – entrance foyer – upstairs offices and landing
- Fire Doors installation: – install 2 new fire doors to the gymnasium
- Ventilation installation: – install a new ventilation system in the ‘old gymnasium’ to manage the condensation build-up.
- Reroof: – replace the roof over the changing rooms area and the foyer area
Our Latest Creations
Latest Projects in Our Portfolio
Avondale Intermediate
Avondale Intermediate, Avondale. Refurbishment of three classrooms and conversion into a special needs unit. Project managers[...]
Kindercare, Albany.
Kindercare, Albany. Extension to head office Completed April 2011 this work was carried out to the[...]
Macleans Primary School
Project Details: Demolition of existing walls, roof, wall coverings, floor coverings, ceilings linings, windows, doors ,[...]
Manly Palm Apartments
Scope Project – Change of use to the first floor level of an existing two/three storey[...]
Takapuna Grammar School – Strength & Conditioning Gym
We’re excited to have the transformed an existing void beneath the main gym into a modern,[...]