Completed Education Sector Projects

Mangere College

Block G (Gym) Refurbishment at Mangere College The Contract Works required are: • Asbestos refurbishment survey • Flooring • Wall lining • Ventilation • Carpentry • Plumbing • Electrical • Roofing. Project Start Date: June 2024 Site Foreman: Loto Faamoana

Uncategorized

Macleans Primary School

Project Details: Demolition of existing walls, roof, wall coverings, floor coverings, ceilings linings, windows, doors , fixtures, furniture, electrical, and lighting Construct new wall framing and floor framing including foundations and waterproofing Supply and installation of new exterior cladding Supply and installation of new lintels Supply and installation of new ceiling framing Supply and installation…

Completed Education Sector Projects

Sunnynook Primary School

The Requirement The Contract Works required are: Block 9: Rooms 21 & 22. Interior refurbishment and outdoor learning area. Scope or works to include: • replace existing wall linings, • install acoustic ceiling tiles to Room 22, • install new large sliding doors to Rooms 21 &22 • Create a new covered outdoor learning area…

Completed Education Sector Projects

Owairoa Primary School

Block 3 ILE Upgrade Block 3 currently comprises of 4 classrooms, and the girls/boys toilet blocks. Project Scope: Classrooms Remove and dispose of carpet, supply and install of new 16oz direct carpet stick carpet tiles. Remove and dispose of the existing hessian wallcoverings. Supply and install new 10mm composite acoustic wall coverings. Existing exposed cables…

Completed Education Sector Projects

Kauri Park School

Project Scope: Block 8 (Rooms 9 & 10) o Remove x2 sets of exterior windows to each classroom. o Install 3 door stackers. o Remedial work to include existing wall linings and wall trims. o Replace existing wall linings with new acoustic wall linings in both classrooms. o In Room 10, replace existing ceiling baffles…

Completed Education Sector Projects

Bayswater School

Block 2 ILE & DQLS Upgrade AMS Combined Scope of project:   To deliver an ILE and DQLS upgrade to the two classrooms and wet area of Block 2. Works include the replacement of wall coverings, floor coverings, ceiling insulation, LED lights, and switchboard. The ILE portion of works will also include new interior aluminium…

Completed Education Sector Projects

Manurewa High School

The scope of this project includes: Replace the internal wall linings. Blocks A, B, C, and D (known to the school as A Block) as they have reached end-of-life, requiring replacement.  The rooms that are included in the scope are: Downstairs – A15, A16, A17, A18, A19, TPT Room Upstairs – A1, A2, A3, A4,…

Completed Education Sector Projects

Bairds Mainfreight

The Contract Works required are: Supply and install new acoustic rated carpet tiles and new vinyl to 6 Teachings Spaces.  Supply and install new acoustic composition board to walls to 6 Teachings Spaces. Remove the existing windows on the veranda side of the 6 classrooms and install double sliding aluminium doors into the existing openings…

Completed Education Sector Projects

Three Kings Primary School

. The Contract Works required are: i. Demolition ii. Supply and installation of new framing iii. Supply and installation of new windows and doors iv. Supply and installation of new insulation v. Supply and installation of new wall, roof, and ceiling linings vi. Supply and installation of new inbuilt seating and cabinetry vii. Supply and…