Northcote Intermediate

The requirements: Classrooms 1,2,3,4• Removal and disposal of the existing floor coverings• Supply and installation of the new floor coverings including floor preparation – carpet tiles and vinyl• Removal and disposal of the existing double hinged timber doors• Supply and installation of the new commercial grade glazed aluminium doors with new door hardware as required• […]
Chapel Downs Primary School – Relocatable Classrooms

Project Overview: This project involved the relocation of 11 classrooms from one side of the school campus to the other. The move was necessary to free up space for a new building development on the school grounds. To ensure functionality and accessibility, new decking was constructed to connect all 11 classrooms. Additionally, a weatherproof canopy […]
Rangitoto College
Gulf Harbour Primary School
James Cook High School

The Requirement – Background The Board of Trustees at James Cook High School wish to deliver 4 projects which form part of the school 10YPP. These projects are as mentioned below. • Project 1 – Block A, E, F, H DQLS Upgrade • Project 2 – Block D, E Toilet Refurbishment • Project 3 –…
Waimahia Intermediate School

The Requirement: The Technology Hub refurbishment project involves the refurbishing of three existing technology classrooms: the Hard technology, Visual Arts and Performance classrooms. The project will involve the installation of new sliding doors between the Hard technology and Visual Arts areas. The removal of a Wall in the Performance classroom and the installation of a…
Botany Downs Secondary College

This project involves the full refurbishment of the gym change rooms. Project Start Date: August 2024 Site Foreman: Eamonn Magee
Papakura Normal School

The Contract Works required are: • Demolition • Asbestos refurbishment survey • Replacement of partition doors and walls • Replacement of toilets • Replacement of basins and taps • Installation of bench seating • Replacement of floor coverings • Replacement of wall coverings • Installation of hot water cylinders (including cabinetry) • Installation of coat…
Ferguson Intermediate School

Block 9 ILE Upgrade at Ferguson Intermediate School Classrooms to be internally refurbish in Block 9 including autex installation, flooring, ceiling and lighting and removal of a wall. Project Start Date: August 2024 Site Foreman: James Howdill
Mangere College

Block G (Gym) Refurbishment at Mangere College The Contract Works required are: • Asbestos refurbishment survey • Flooring • Wall lining • Ventilation • Carpentry • Plumbing • Electrical • Roofing. Project Start Date: June 2024 Site Foreman: Loto Faamoana