Author name: 123 Online

Completed Education Sector Projects

Opaheke School

Project Scope – Opaheke School   The current classroom block consisting of 4 classrooms is old including double corridors. The classrooms are all separated and not an ideal environment for ILE purposes.  Floor and lighting require replacement. Replace current exterior East side windows with Bi fold doors to allow better access to the exterior. Replace…

Completed Education Sector Projects

St Leonards

Project Scope – St Leonard’s Primary School   To refurbish the existing Blocks 1 & 3 toilets where the  internal areas have been damaged due to water leaks through the existing roof. Block 2 toilets and breakout areas are to be upgraded to provide an integrated area for the students to have updated toilet facilities and…

Completed Education Sector Projects

Orewa Childcare Facility

Project Scope – Orewa Childcare Facility on Sunny Heights Road in Orewa. The centre will cater for a maximum of 100 children and about 17 staff in an area of significant residential growth.   Cut and fill to site Install piles for retaining walls and building Install new drainage and tanks Install new slab Construction of new…

Uncategorized

Mellons Bay School

Project Scope – Mellons Bay School, The main works is to demolish two internal corridor walls and install new beams to carry the roof load. This will create a larger open plan teaching space for two classrooms. Doors and windows within the block will be replaced with new aluminium units, and there will be some…

Completed Education Sector Projects

Riverina School

  Project Scope -This is Riverina School this is a refurbishment of 5 classrooms that will be used as a open learning space. Installation of new carpets wall linings heat pumps and new doors and windows. Project start date: October 2021 Date of completion:  December 2021 Total Project Value: $235,000    

Uncategorized

Chapel Downs Primary School

Project Scope – Library, Staffroom & Kitchen upgrade Demolition of old library, reception and ITC room. Convert into a new staffroom with new fitted kitchen, new floor covering, autex to the walls and new joinery.   Install a new deck including steps that lead from the library out to the astro turf area. Project start…

Completed Education Sector Projects

Avondale College

Project Scope – Deck extension with an install of a single leaf door to Block S – Staffroom at Avondale College. The school is aiming to complete the project which includes extending the existing wood deck, converting the existing glass façade to include a single leaf door, and extending the existing sprinkler lines under the…

Completed Education Sector Projects

Sunnyhills Primary School

Project Scope – Accessibility bathroom & toilets to Block 3 & Block 5, canteen toilets Strip out of the boys bathrooms in Block C, refurbish the toilets to the same specification as the drawings. Remove all linings and floor coverings, run hot water to all new basins, insulate and insert new linings and coverings. Remove…

Scroll to Top