Home / Sectors /


The contract works required are: Block 8 refurbish toilet blocks on ground floor and 1st floor[...]
The requirements: Classrooms 1,2,3,4• Removal and disposal of the existing floor coverings• Supply and installation of[...]
Kindercare, Albany. Extension to head officeCompleted April 2011 this work was carried out to the main[...]