St Leonards

Project Scope – St Leonard’s Primary School   To refurbish the existing Blocks 1 & 3 toilets where the  internal areas have been damaged due to water leaks through the existing roof. Block 2 toilets and breakout areas are to be upgraded to provide an integrated area for the students to have updated toilet facilities and…

Orewa Childcare Facility

Project Scope – Orewa Childcare Facility on Sunny Heights Road in Orewa. The centre will cater for a maximum of 100 children and about 17 staff in an area of significant residential growth.   Cut and fill to site Install piles for retaining walls and building Install new drainage and tanks Install new slab Construction of new…

Riverina School

  Project Scope -This is Riverina School this is a refurbishment of 5 classrooms that will be used as a open learning space. Installation of new carpets wall linings heat pumps and new doors and windows. Project start date: October 2021 Date of completion:  December 2021 Total Project Value: $235,000    

Alfriston School

Project Scope – The refurbishment of 2 classrooms and instillation of a new kitchen. Autex throughout , new floor coverings.   Project start date: July 2021 Date of completion: October 2021 Total Project Value: $120,000

Avondale College

Project Scope – Deck extension with an install of a single leaf door to Block S – Staffroom at Avondale College. The school is aiming to complete the project which includes extending the existing wood deck, converting the existing glass façade to include a single leaf door, and extending the existing sprinkler lines under the…

Sunnyhills Primary School

Project Scope – Accessibility bathroom & toilets to Block 3 & Block 5, canteen toilets Strip out of the boys bathrooms in Block C, refurbish the toilets to the same specification as the drawings. Remove all linings and floor coverings, run hot water to all new basins, insulate and insert new linings and coverings. Remove…

Pakuranga Heights School

Project Scope – Existing school hall recladding project – demo, new framing, RAB, Cladding, aluminium doors/windows Replace existing roof and extend to form verandah, Site works and some drainage.   Project start date: October 2021 Date of completion: December 2021 Project value: $445,000    

Fruitvale School

Project Scope – The Contract Work required: i. Block 1: convert 2 sections of toilet blocks to teacher’s offices; toilet refurbishment; staffroom kitchen refurbishment ii. Block 2: create integrated learning environment across classrooms iii. Block 7: hall kitchen refurbishment Project start date: April 2021 Project completion: July 2021 Project Value: $450,000  

The Hall and Administration Upgrade at Papatoetoe High School

Project Scope: Hall windows to west side to be partially filled filled and exterior of building clad to match the east side; New window winders in hall; strengthening works to mezzanine internal stairs; targeted replacement of hall ceiling linings and new light fittings installed; new film to existing window joinery; repaint all interior walls; apply…

Gulf Harbour School

Project Scope – New open learning space Project start date: June 2020 Date of completion: October 2020 Total Project Value: $600,000