Project Scope – Refurbish interior of existing Administration Building, replace/refurbish the windows and re-roof the building in part. Construct new entrance canopy and
new external raised decking, stairs and ramps. Install specified structural components and building services systems. Complete associated external works.Demolish and dispose of two-classroom block with asbestos containing materials, as per MOE policies and procedures, and making good of neighbouring building.
Demolish and dispose of concrete walkways, ramps and steps.
Demolish and dispose of existing main entrance.
Demolish and dispose of internal walls, linings, ceilings and flooring.
Supply and install structural steel elements (posts and beams).
Remove and dispose of existing window and door joinery with new units to be supplied and installed.
Refurbish identified existing window joinery units.
Construction of new main entrance and external deck.
Construction of new walls and ceilings with insulation, linings, wall and floor coverings as well as paint.
Internal refurbishment of existing bathroom facilities and construction of new Acc. WC.
Limited exterior works remediating identified water egress issues.
Supply and installation of new joinery units for storage, reception and kitchen facility;
Installation of new and alternation of existing services including electrical, plumbing, fire and mechanical.
Siteworks including but not limited to landscaping, new asphalt area, new fencing and gates where detailed.
Richmond Road School
Home / Sectors /
Richmond Road School
Project start date: March 2020
Date of completion: April 2021 (This project was delayed due to Covid and the Council requesting it to become a total reclad)
Total Project Value: $1,933,000
Licenses & Certifications
Industry Verified Accreditations

Member of the certified Builders Association of New Zealand

Licensed Building Practitioner
Our Latest Creations
Latest Projects in Our Portfolio
Sir Edmund Hillary Collegiate
Sir Edmund Hillary Collegiate. Refurbishment of two teaching blocks over four phases. Project consists of converting[...]
Mellons Bay School
Project Scope – Mellons Bay School, The main works is to demolish two internal corridor walls[...]
Papatoetoe High School
Papatoetoe High School. Project value $1.2 M Completion November 2014 Papatoetoe High School educates a number[...]
Edendale Primary School
The contract works required are: The construction works will include demolition, and redevelopment/modernization of the spaces[...]
Warkworth School
This project requires the construction of a wall in the centre of the junior Block[...]
Avondale Intermediate
Avondale Intermediate, Avondale. Refurbishment of three classrooms and conversion into a special needs unit. Project managers[...]
Willow Park Primary School
The contract works required are: Remove and dispose of the existing window joinery units. Supply and[...]
Chapel Downs Primary School – Relocatable Classrooms
Project Overview: This project involved the relocation of 11 classrooms from one side of the school[...]
Botany Downs Secondary College
This project involves the full refurbishment of the gym change rooms. Project Start Date: August[...]
Waiheke High School
Waiheke High School. Accessibility works and construction of a new special needs toilet/shower facility. Project Managers[...]